This newly constructed industrial/flex space is located adjacent to CVG and approximately 1 mile from I-75. The building has a well designed exterior appearance with eight (8) drive in doors and is constructed with a flexible design to accommodate as many as eight separate businesses. The building has an 18' ceiling height, a community dock, and a Level 3 EV charging station. Construction of the building shell was completed in March 2025 and the interior is ready to be finished to your specifications.